Queens Award

Case Study

Harrow School UK Science Building


The pioneering Harrow School Science Building reflects the school’s long-standing tradition of academic excellence and commitment to sustainability. It features 16 state of the art Chemistry and Biology laboratories, spread across three floors, including two dedicated research labs for specialist projects and A level studies.

Established in 1572 under a Royal Charter granted by Queen Elizabeth I, Harrow is one of the most respected schools in the world. The newly opened facility is part of a comprehensive 450 development programme.

S+B were involved in the early stages of the project, starting their collaboration with Rivington Street Studio, who led the vision of this transformative project, in 2016. We worked closely on developing the furniture specification for the  state of the art laboratories, manufactured and installed by S+B UK.

The Chemistry and Biology labs feature sleek, long benches with Velstone worktops, integrated storage, utilities, teacher’s demo desks, and tall storage. The Biology Research Lab provides a flexible layout with mobile tables serviced by fitted service towers.

The transformative construction project will build on the school’s strong heritage in science, benefiting future Harrovian scientists, partner schools, and the local community.

The photos below, courtesy of Neilcott Construction Limited and 3DH Photography, showcase the inspiring lab learning environments we helped create.


Client Testimonial

"I would like to take this opportunity to express my appreciation for the outstanding service provided by your team at the Harrow School Science Building.

From the initial design phase through to the successful on-site installation, your team’s commitment to excellence has been evident at every stage. The quality of the materials used, the effective QA structure, and the overall delivery have been excellent.

All project milestones were met on schedule, and the work was completed in a controlled and safe manner. The final installation demonstrates your team's hard work, skill, and attention to detail.

I would especially like to acknowledge Paul Mullen for his flexible co-operative approach and positive attitude throughout the construction phase of the project. These attributes were key to the delivery of this project.

I look forward to the opportunity to work with you again in the future."

Rob Schofield
Project Manager
Neilcott Construction Ltd