Coventry University’s new Beatrice Shilling Building (BSB) is currently under construction and is due for completion early 2020, the new building is a £27 million project which will provide STEM (Science, Technology, Engineering and Maths) facilities and will be used by the University’s Faculty of Engineering, Electronics and Computing.
S+B secured the project using Exemplaire C frame system with Trespa TopLab Plus worktops and under bench storage is a mixture of fixed, mobile and suspended. There are various laboratories located on three of the four floors of the building and S+B worked closely with the Main Contractor Speller Metcalfe to ensure that all end-user expectations were met with regard to both quality of product and requirements.